
SanClementeDam
California’s largest dam removal project is under way in Monterey County under the supervision of DWR’s Division of Safety of Dams (DSOD). DSOD agreed with the plan to remove the 106-foot-high San Clemente Dam on the scenic Carmel River after a study determined the dam seismically unsafe. Photo taken July 17, 2014.
Tagged with:
Blog ImagesDatabase
This is the content currently stored in the post and postmeta tables.
object(Timber\Post)#3742 (44) {
["ImageClass"]=>
string(12) "Timber\Image"
["PostClass"]=>
string(11) "Timber\Post"
["TermClass"]=>
string(11) "Timber\Term"
["object_type"]=>
string(4) "post"
["custom"]=>
array(5) {
["_wp_attached_file"]=>
string(18) "SanClementeDam.jpg"
["wpmf_size"]=>
string(6) "343641"
["wpmf_filetype"]=>
string(3) "jpg"
["_wp_attachment_metadata"]=>
array(5) {
["width"]=>
int(682)
["height"]=>
int(306)
["file"]=>
string(18) "SanClementeDam.jpg"
["sizes"]=>
array(9) {
["sm_20x9"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-640x288.jpg"
["width"]=>
int(640)
["height"]=>
int(288)
["mime-type"]=>
string(10) "image/jpeg"
}
["sm_3x2"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-640x306.jpg"
["width"]=>
int(640)
["height"]=>
int(306)
["mime-type"]=>
string(10) "image/jpeg"
}
["xs_3x2"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-320x213.jpg"
["width"]=>
int(320)
["height"]=>
int(213)
["mime-type"]=>
string(10) "image/jpeg"
}
["xxs_3x2"]=>
array(4) {
["file"]=>
string(25) "SanClementeDam-100x67.jpg"
["width"]=>
int(100)
["height"]=>
int(67)
["mime-type"]=>
string(10) "image/jpeg"
}
["sm_2x3"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-640x306.jpg"
["width"]=>
int(640)
["height"]=>
int(306)
["mime-type"]=>
string(10) "image/jpeg"
}
["xs_2x3"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-320x180.jpg"
["width"]=>
int(320)
["height"]=>
int(180)
["mime-type"]=>
string(10) "image/jpeg"
}
["sm_1x1"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-640x306.jpg"
["width"]=>
int(640)
["height"]=>
int(306)
["mime-type"]=>
string(10) "image/jpeg"
}
["xs_1x1"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-320x306.jpg"
["width"]=>
int(320)
["height"]=>
int(306)
["mime-type"]=>
string(10) "image/jpeg"
}
["xxs_1x1"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-100x100.jpg"
["width"]=>
int(100)
["height"]=>
int(100)
["mime-type"]=>
string(10) "image/jpeg"
}
}
["image_meta"]=>
array(12) {
["aperture"]=>
string(3) "6.3"
["credit"]=>
string(32) "California Dept. of Water Resour"
["camera"]=>
string(10) "NIKON D800"
["caption"]=>
string(318) "California's largest dam removal project is under way in Monterey County under the supervision of DWR's Division of Safety of Dams (DSOD). DSOD agreed with the plan to remove the 106-foot-high San Clemente Dam on the scenic Carmel River after a study determined the dam seismically unsafe. Photo taken July 17, 2014."
["created_timestamp"]=>
string(10) "1405612721"
["copyright"]=>
string(13) "Public Domain"
["focal_length"]=>
string(2) "28"
["iso"]=>
string(3) "100"
["shutter_speed"]=>
string(8) "0.003125"
["title"]=>
string(0) ""
["orientation"]=>
string(1) "1"
["keywords"]=>
array(2) {
[0]=>
string(16) "San Clemente Dam"
[1]=>
string(32) "San Clemente Dam removal project"
}
}
}
["wpmf_order"]=>
string(1) "0"
}
["___content":protected]=>
string(798) "California’s largest dam removal project is under way in Monterey County under the supervision of DWR’s Division of Safety of Dams (DSOD). DSOD agreed with the plan to remove the 106-foot-high San Clemente Dam on the scenic Carmel River after a study determined the dam seismically unsafe. Photo taken July 17, 2014.
"
["_permalink":protected]=>
string(71) "https://www.ppic.org/blog/the-carmel-river-gets-a-boost/sanclementedam/"
["_next":protected]=>
array(0) {
}
["_prev":protected]=>
array(0) {
}
["_css_class":protected]=>
NULL
["id"]=>
int(5004)
["ID"]=>
int(5004)
["post_author"]=>
string(1) "1"
["post_content"]=>
string(318) "California's largest dam removal project is under way in Monterey County under the supervision of DWR's Division of Safety of Dams (DSOD). DSOD agreed with the plan to remove the 106-foot-high San Clemente Dam on the scenic Carmel River after a study determined the dam seismically unsafe. Photo taken July 17, 2014."
["post_date"]=>
string(19) "2017-04-20 15:05:07"
["post_excerpt"]=>
string(0) ""
["post_parent"]=>
int(5003)
["post_status"]=>
string(7) "inherit"
["post_title"]=>
string(14) "SanClementeDam"
["post_type"]=>
string(10) "attachment"
["slug"]=>
string(14) "sanclementedam"
["__type":protected]=>
NULL
["_wp_attached_file"]=>
string(18) "SanClementeDam.jpg"
["wpmf_size"]=>
string(6) "343641"
["wpmf_filetype"]=>
string(3) "jpg"
["_wp_attachment_metadata"]=>
array(5) {
["width"]=>
int(682)
["height"]=>
int(306)
["file"]=>
string(18) "SanClementeDam.jpg"
["sizes"]=>
array(9) {
["sm_20x9"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-640x288.jpg"
["width"]=>
int(640)
["height"]=>
int(288)
["mime-type"]=>
string(10) "image/jpeg"
}
["sm_3x2"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-640x306.jpg"
["width"]=>
int(640)
["height"]=>
int(306)
["mime-type"]=>
string(10) "image/jpeg"
}
["xs_3x2"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-320x213.jpg"
["width"]=>
int(320)
["height"]=>
int(213)
["mime-type"]=>
string(10) "image/jpeg"
}
["xxs_3x2"]=>
array(4) {
["file"]=>
string(25) "SanClementeDam-100x67.jpg"
["width"]=>
int(100)
["height"]=>
int(67)
["mime-type"]=>
string(10) "image/jpeg"
}
["sm_2x3"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-640x306.jpg"
["width"]=>
int(640)
["height"]=>
int(306)
["mime-type"]=>
string(10) "image/jpeg"
}
["xs_2x3"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-320x180.jpg"
["width"]=>
int(320)
["height"]=>
int(180)
["mime-type"]=>
string(10) "image/jpeg"
}
["sm_1x1"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-640x306.jpg"
["width"]=>
int(640)
["height"]=>
int(306)
["mime-type"]=>
string(10) "image/jpeg"
}
["xs_1x1"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-320x306.jpg"
["width"]=>
int(320)
["height"]=>
int(306)
["mime-type"]=>
string(10) "image/jpeg"
}
["xxs_1x1"]=>
array(4) {
["file"]=>
string(26) "SanClementeDam-100x100.jpg"
["width"]=>
int(100)
["height"]=>
int(100)
["mime-type"]=>
string(10) "image/jpeg"
}
}
["image_meta"]=>
array(12) {
["aperture"]=>
string(3) "6.3"
["credit"]=>
string(32) "California Dept. of Water Resour"
["camera"]=>
string(10) "NIKON D800"
["caption"]=>
string(318) "California's largest dam removal project is under way in Monterey County under the supervision of DWR's Division of Safety of Dams (DSOD). DSOD agreed with the plan to remove the 106-foot-high San Clemente Dam on the scenic Carmel River after a study determined the dam seismically unsafe. Photo taken July 17, 2014."
["created_timestamp"]=>
string(10) "1405612721"
["copyright"]=>
string(13) "Public Domain"
["focal_length"]=>
string(2) "28"
["iso"]=>
string(3) "100"
["shutter_speed"]=>
string(8) "0.003125"
["title"]=>
string(0) ""
["orientation"]=>
string(1) "1"
["keywords"]=>
array(2) {
[0]=>
string(16) "San Clemente Dam"
[1]=>
string(32) "San Clemente Dam removal project"
}
}
}
["wpmf_order"]=>
string(1) "0"
["post_date_gmt"]=>
string(19) "2017-04-20 22:05:07"
["comment_status"]=>
string(4) "open"
["ping_status"]=>
string(6) "closed"
["post_password"]=>
string(0) ""
["post_name"]=>
string(14) "sanclementedam"
["to_ping"]=>
string(0) ""
["pinged"]=>
string(0) ""
["post_modified"]=>
string(19) "2017-05-03 18:02:47"
["post_modified_gmt"]=>
string(19) "2017-05-04 01:02:47"
["post_content_filtered"]=>
string(0) ""
["guid"]=>
string(57) "http://www.ppic.org/wp-content/uploads/SanClementeDam.jpg"
["menu_order"]=>
int(0)
["post_mime_type"]=>
string(10) "image/jpeg"
["comment_count"]=>
string(1) "0"
["filter"]=>
string(3) "raw"
["status"]=>
string(7) "inherit"
["attachment_authors"]=>
bool(false)
}